Financial comparison of fiber and metal mat in flooring applications
Same load / same floor thickness:
1 cubic meter of concrete needs 30/35 kg of iron + blacksmiths (total cost $30)
1 cubic meter of concrete needs 2.5 kg of fibers, no blacksmiths (total cost $15)
50% financial savings